Showing posts with label World News (ENG). Show all posts
Showing posts with label World News (ENG). Show all posts

Thursday, July 2, 2015

Phoenix Contact introduces new surge protection devices for 1,500 volts

article originally published in www.sunwindenergy.com, on June 26th, 2015
Large photovoltaic systems are increasingly using a higher operating voltage of 1,500 V, which makes transmitting the electricity to the inverter more cost-effective. Phoenix Contact has now introduced the new VAL-MB product range of type 1/2 lightning / surge arresters for this application area. The devices in this product range are suitable for the higher generator voltage.
The manufacturer emphasises that the devices are specifically designed to fulfil the requirements of DC applications and are certified by the Dutch KEMA (DNV GL). The protection devices feature longer cable insertion funnels and higher protective shafts for the screws to improve protection against arcing. The product range includes type 1/2 lightning/surge arresters as well as simple type 2 surge protection devices for generator voltages of 600, 1,000 and 1,500 V DC. Phoenix Contact supplies the devices with or without remote indication contact. The manufacturer specifies a short-circuit rating of 2000 A for this range of surge arresters, and they can be used at altitudes of up to 6,000 metres above sea level.
Surge protection for a generator voltage of up to 1,500 V DC (Photo: Phoenix Contact)
Surge protection for a generator voltage of up to 1,500 V DC (Photo: Phoenix Contact)

Tuesday, June 2, 2015

Affordable solar power pricing creates huge opportunity in UAE

Article originally published on solar builder magazine, in June 1st, 2015

UAE solar demand
Solar energy pricing in the United Arab Emirates (UAE) has now reached parity with fossil fuel models, according to a report published by the International Renewable Energy Agency (IRENA). This ‘REmap 2030’  report, researched in conjunction with Masdar Institute and the UAE Ministry of Foreign Affairs’ Directorate of Energy and Climate Change, says that solar is economically attractive and commercially viable for the first time ever in the nation’s history.
Solar is the critical resource and focus for the UAE, with different forms of solar energy accounting for more than 90% of renewable energy use in the IRENA ‘REmap 2030’ report. PV module prices, as perhaps the best example of renewables’ new affordability, have fallen by close to 75% since 2008.
International demand is growing beyond just the UAE, says this report on developing nations
But the IRENA report said that the most important enabling factor for renewable energy in the UAE will be the empowerment of government agencies to take holistic, comparative views of energy costs and act on them.
Solar power, together with other renewable energy sources, could save the country billions of dirhams annually while introducing innumerable health and environmental benefits, while also acting to preserve precious existing fossil fuel resources.
“We believe that, for the UAE and wider Arabian Gulf, solar power is perhaps the most promising of all renewable energy sources – creating jobs while preserving existing energy reserves – and that is why we have created a dedicated exhibition zone in which this ever-popular renewable energy technology can be showcased. The event has always attracted the world’s biggest names in the solar sector, and, now, we are clustering them together in one area,” said Naji El Haddad, group event director of the annual World Future Energy Summit hosted by Masdar and part of Abu Dhabi Sustainability Week.
In 2015, there were 154 exhibiting companies from the solar sector occupying a gross space of 7,200 square meters, with more than 6,500 solar industry professionals in attendance, many of them from across the region where the uptake of solar energy is on the rise. Egypt, as one example, recently announced that the country plans to generate 18,000 MW of solar power over the next five years.
In fact, the 2016 running of the event will see the launch of ‘WFES Solar Expo’, a dedicated area on the show floor for showcasing solar technology and innovation, and bringing together experts, innovators, suppliers, and buyers. More than 150 exhibitors have already confirmed their participation, with such global names as First Solar and Hanergy committed to take part in the exhibition and discussion proceedings.
“The potential of solar power to quickly transform the energy sector in a lasting way should not be underestimated. And the related technologies and solutions from around the world are progressing so quickly that the industry is calling out for a single place at which to meet and advance solar power issues. Naturally, that place is Abu Dhabi,” added El Haddad.
The World Future Energy Summit (WFES) 2016 will take place at the Abu Dhabi National Exhibition Centre 18-21 January 2016, and will form the centerpiece of Abu Dhabi Sustainability Week 2016, with 650 exhibiting companies from more than 40 countries, and more than 32,000 attendees from 170 countries. In addition to Solar Expo, International Water Summit and EcoWASTE will also be co-located at the WFES event.

Thursday, April 23, 2015

Growth of Solar Energy Another Reason to Celebrate Earth Day

Article originally published in www.renewableenergyworld.com , on April 9th, 2015.


Convergence Energy, LLC
In 1970, the first ever Earth Day was held to demonstrate broad global support for environmental protection. At the time, the world’s population stood at 3.63 billion. Today, that number has more than doubled.  
Well, guess what? Greenhouse gas emissions have doubled since then, too. Simply put, the world is in real danger, locked in on a collision course with disaster.
It’s time to be honest with ourselves. We’re facing a watershed moment in our nation’s history. Today, climate change is a real and growing threat to America and the rest of the world. It’s indisputable. Sea levels are rising. We’re experiencing more intense and unpredictable storms. And droughts plague the world. Clearly, climate change threatens our economy, our future progress, our health and safety, and even our way of life. Every day, the Earth suffers a little more from human neglect. We can’t wish this problem away, and pointing fingers won’t solve it, either. 
In celebration of today’s 45th annual Earth Day, the Solar Energy Industries Association (SEIA) plans to mark the historic occasion every 2.5 minutes of every hour of the day, as a new solar installation is completed in America. What’s more, new figures from the U.S. Solar Market Insight 2014 Year in Reviewshow a record amount of new, clean solar energy coming online over the next 20 months, greatly benefitting the environment.
When the very first Earth Day was held, there was virtually no solar energy powering the grid in the United States. How times have changed. Today, there are 20 gigawatts (GW) of installed solar capacity in the U.S. – enough to power more than 4 million American homes – and we’re going to double both of those numbers by the end of next year. That’s our commitment to America – and to our planet. By the end of 2016, solar is expected to offset nearly 45 million metric tons of harmful carbon emissions, the equivalent of removing nearly 10 million cars off U.S. roads and highways, or shuttering 12 coal-fired plants. That’s a pretty impressive “high five” for our environment.
Consider what’s happened. It took 40 years for the U.S. to install its first 20 GW of solar, but the nation will add another 20 GW by the end of 2016. Here are some of the other projections from the latest SEIA/GTM Research report:
  • 16 states will install more than 100 megawatts (MW) of solar in 2016. In 2010, only two states did.
  • In 2016, California is expected to install as much solar photovoltaic (PV) capacity as the entire country did in 2014.
  • The U.S. will surpass 1 million residential solar installations during the next two years.
  • Solar will be close to generating 2 percent of America’s electricity needs by the end of 2016. In 2010, solar represented just 0.1 percent of capacity.
  • All solar market sectors – residential, non-residential and utility scale – are expected to grow by 25 to 50 percent over the next two years.
Today, the U.S. solar industry employs 174,000 Americans nationwide – more than tech giants Apple, Google, Facebook and Twitter combined – and pumps nearly $18 billion a year into our economy. This remarkable growth is due, in large part, to smart and effective public policies, such as the solar Investment Tax Credit (ITC), Net Energy Metering (NEM) and Renewable Portfolio Standards (RPS). By any measurement, these policies are paying huge dividends for both the U.S. economy, as well as for the environment. For our industry, this truly is an exciting and promising time to be celebrating Earth Day. As the old saying goes, “actions speak louder than words,” and every new solar system that comes online today represents a win for the future of our planet.

Wednesday, April 15, 2015

EDF and Marubeni partner on 146 MW Chilean merchant plant

Article publishd in www.pv-magazine.com, on April 14th, 2015

France's EDF Energies Nouvelles will partner with Japan's Marubeni to develop a 146 MW power plant in Chile's Atacama Desert. The Laberinto PV power plant will be one of the largest upon completion.
The Atacama desert.
The Atacama desert has become a highlight of the global solar industry, however there are concerns regarding remaining transmission capacity.
Chile’s large-scale PV market remains a global highlight, with the latest project a 146 MW utility scale array to be connected to he Northern Interconnected System. The project marks EDF Energies Nouvelles entry into the Chilean market, the 20th country in which the firm is active.
EDF has formed a subsidiary EDF EN Chile to execute on the project and pursue further activities in the Latin America solar leader. EDF will carry out the construction on the project and the O&M.
A number of superlatives apply to the project. Located in the Atacama Desert, the array will be exposed to the highest irradiation levels in the world. Furthermore, at 146 MW it will be one of the world’s largest merchant PV power plants.
“By expanding into Chile just after Brazil… in the South American continent, EDF Energies Nouvelles has achieved one of its objectives to develop its activities in emerging markets with a high development potential, and Laberinto, a sizable solar project, is a perfect example,” said company CEO Antoine Cahuzac. He continued that the quality of the project is displayed by the high profile lenders including Japan’s Marubeni.
The project is the third between EDF and Marubeni having previously partnered on two North American projects.
Marubeni says the project aligns with its strategy to develop low-carbon generation sources and expand into Latin America. Labertinto is Marubeni’s first in the region.

Monday, April 13, 2015

Why The Buzz Around Floating Solar PV?

We have said this before: floating solar is the new exotic solar these days.


From Australia, to India, to Japan, to Korea, to the US, and now Brazil, everyone has been announcing floating solar pv power projects in all shapes and sizes.
The reason these countries are in such a rush is bcause floating solar PV technology offers a number of advantages:
Natural evaporative cooling as a result of the water body can keep the PV panel temperatures lower than ground mounted ones, and hence boost their efficiency.Balbina Dam (Usina Hidreletrica de Balbina)
Typically areas with high solar energy potential tend to be dusty and arid, so in comparison to their ground mounted counterparts, floating PV system not only have to perform in a low dust environment, they can always use a sprinkler to bathe themselves clean.
Many of the developers who have floating PV projects in the pipeline make it a point to announce that they “reduce water evaporation to a great extent” (Side note — while water evaporation is definitely a benefit, it is questionable how much water it can really save).
Availability of land is a big problem. This is one of the primary reasons why Japan has been interested in the floating PV technology. If one is planning to put floating PV in dam reservoirs (Brazil and India), you can make better use of the reservoir surface, which is anyway lying idle. Also no land acquisition = happy people = no murky politics!
In dam reservoir-based hydro power plants, solar power can substitute hydro based generation during day time when sun is available. In such a case, the stored water in the reservoir will serve as an effective energy storage systems. One possible example would be the 350 MW plant that is expected to come up in Brazil.
A number of technology developers have been working hard to further develop and perfect these systems.
In Israel, Solaris Synergy has developed a concentrated photovoltaic technology for a floating farm that can support power output ranging from several kW to dozens of MW.
Australian start-up Sunengy has partnered with Tata Power of India to develop a similar solar system for the reservoir of a hydropower plant in Mumbai. The company has developed a concentrated solar PV array that can track the sun while staying afloat, to maximize its output.
In US, SPG (which was taken over by SunEdison) has installed what it calls “Floatovoltaics” in the water ponds of Far Niente winery, California.
Meanwhile in France, Ciel & Terre have been integrating standard PV panels with HDPE floats which are UV and corrosion-resistant.

Article published in www.cleantechnica.com, on April 13th, 2015.

Thursday, April 9, 2015

Battery energy storage project shows promise for electricity network

wth rising electricity prices one of the biggest issues facing households, Griffith University (Australia) research into energy storage and supply holds the promise of cheaper, better quality power for the low voltage (LV) electricity distribution network.
According to the research from Griffith's School of Engineering and published in the journal Applied Energy, a forecast-based, three-phase battery energy storage scheduling and operation system provides benefits such as reduced peak demand, more efficient load balancing and better management of supply from solar photovoltaics (PV).
Researcher Mr Chris Bennett, working under the supervision of Associate Professor Rodney Stewart and Professor Jun Wei Lu, has developed and applied an intelligent scheduling system to a South-East Queensland-based LV distribution network servicing 128 residential customers.
"The low voltage network is a typical suburb of a few hundred homes where there is a single area transformer and recently there has been a substantial increase in the number of homes with installed residential solar PV in these settings," says Mr Bennett.
"Daily peak demand in residential networks typically occurs in the evenings in summer and both late morning and evening in winter. But because solar PV generation is dependent on incoming solar radiation, peak generation occurs during the middle of the day, typically when demand in the residential distribution network is low."
"This means there is an incongruity between when energy is generated and when it is required, which can lead to power supply and quality issues.
"However, with a battery energy storage (BES) system comprising Lithium Ion battery banks coupled with smart power control systems, such as STATCOMS, and featuring embedded intelligent forecasting software, we can better manage the LV network."
Associate Professor Stewart says the recent significant uptake of solar PV has in some locations created issues in the LV network, including surplus power being pushed up the grid, unbalanced phases and poor power quality.
"Our solution tackles these immediate issues while also setting the foundation for a future smart grid," he says.
"The two main advantages of intelligent BES in the LV network are that we can mitigate power quality issues attributed to fluctuations in generation from renewable energy sources such as PV, and we can store surplus energy gathered during the middle of the day and distribute it when it is needed in the evening peak period.
"If such a system was implemented across an entire city it would reduce wholesale peak generation charges, alleviate costly upgrades to the grid, reduce the average time of outages and improve power quality for customers."
Associate Professor Stewart and Mr Bennett agree that distributed energy resources and smart power control electronics can revolutionise the grid and reduce the price of electricity for customers.

Article published www.sciencedaily.com, on April 2, 2015.

Friday, October 12, 2012

Researchers Create 'Nanoflowers' for Energy Storage, Solar Cells

Article published on www.sciencedaily.com October 11, 2012 

Researchers from North Carolina State University have created flower-like structures out of germanium sulfide (GeS) -- a semiconductor material -- that have extremely thin petals with an enormous surface area. The GeS flower holds promise for next-generation energy storage devices and solar cells.

"Creating these GeS nanoflowers is exciting because it gives us a huge surface area in a small amount of space," says Dr. Linyou Cao, an assistant professor of materials science and engineering at NC State and co-author of a paper on the research. "This could significantly increase the capacity of lithium-ion batteries, for instance, since the thinner structure with larger surface area can hold more lithium ions. By the same token, this GeS flower structure could lead to increased capacity for supercapacitors, which are also used for energy storage."
To create the flower structures, researchers first heat GeS powder in a furnace until it begins to vaporize. The vapor is then blown into a cooler region of the furnace, where the GeS settles out of the air into a layered sheet that is only 20 to 30 nanometers thick, and up to 100 micrometers long. As additional layers are added, the sheets branch out from one another, creating a floral pattern similar to a marigold or carnation.
"To get this structure, it is very important to control the flow of the GeS vapor," Cao says, "so that it has time to spread out in layers, rather than aggregating into clumps."
GeS is similar to materials such as graphite, which settle into neat layers or sheets. However, GeS is very different from graphite in that its atomic structure makes it very good at absorbing solar energy and converting it into useable power. This makes it attractive for use in solar cells, particularly since GeS is relatively inexpensive and non-toxic. Many of the materials currently used in solar cells are both expensive and extremely toxic.
The paper, "Role of Boundary Layer Diffusion in Vapor Deposition Growth of Chalcogenide Nanosheets: The Case of GeS," is published online in the journal ACS Nano. The paper was co-authored by Cao; Dr. Chun Li, a former postdoctoral researcher at NC State, now a professor at the University of Electronic Science and Technology of China; Liang Huang, a former visiting Ph.D. student at NC State; Gayatri Pongur Snigdha, a former undergraduate student at NC State; and Yifei Yu, a Ph.D. student at NC State. The work was supported by the U.S. Army Research Office.

Find more about innovation on PV sector at www.ciel-et-terre.net/floating-solar-system/

Monday, June 11, 2012

Winaico to present new 255 W PV module at 2012 Intersolar Europe

Article published in http://www.solarserver.com

On June 4th, 2012, WINAICO Deutschland GmbH (Creglingen, Germany) announced that it will present its new mono-crystalline photovoltaic (PV) module with completely black design at the 2012 Intersolar. The new PV module will be available with a nominal output of 250 W and 255 W.
"Due to the increased demand for high performance modules with first-class aesthetics we decided to modify our previous mono-crystalline module range, whilst simultaneously succeeding in further improving the value for money," stated Sascha Rossmann, director sales & marketing at WINAICO.
WINAICO is a subsidiary of the semiconductor company Win Win Precision Technology Co. Ltd.

Discover our solution to promote the PV technologies :

Friday, June 8, 2012

Japan's Solar Market Poised for Return to Elite Status

Article published in www.renewableenergyworld.com, June 7th written by Cathy Boone

Wednesday, June 6, 2012

Top 10 des pays producteurs d’électricité photovoltaïque en Europe

Article publié sur le site : http://www.batiactu.com le 4 juin 2012

Malgré la crise financière mondiale, le marché du photovoltaïque poursuit sa croissance. Plus de 29.000 MWc ont été raccordés en 2011 (+73 %) dans le monde, dont 21.500 pour le seul continent européen, qui a désormais une puissance installée de 51.357 MWc. L’an passé, la production d’électricité photovoltaïque dans l’Union européenne a dépassé les 44 TWh.



Une récente étude EurObserv’ER montre que l’Union européenne demeure la principale zone d’installation du photovoltaïque dans le monde. 


Contre toute attente, et malgré les coups de freins successifs donnés par les gouvernements européens (Allemagne et France en tête), le marché de l’électricité solaire a poursuivi sa croissance durant l’année 2011, et particulièrement sur le Vieux continent. L’Allemagne (+9.280 MWc par rapport à 2010) et l’Italie (+7.505 MWc) se détachent assez nettement, avec à elles deux une puissance connectée supplémentaire de près de 17.000 MWc. La France, elle aussi, progresse, avec +1.600 MWc de puissance reliée au réseau, ce qui en fait le 3e marché européen.


En tout, durant l’année 2011, 21.529 MWc de centrales photovoltaïques ont été connectées, portant la puissance cumulée du parc de l’Union européenne à 51.357 MWc. Il s’agit donc du secteur électrique le plus dynamique en termes d’installations, loin devant l’éolien (+9.368 MW), les centrales à gaz naturel (+9.718 MW), les centrales au charbon (+2.200 MW), celles au fioul (+700 MW) ou les centrales nucléaires (+331 MW). Les énergies renouvelables ont donc le vent en poupe, puisqu’elles représentent plus de 70 % des puissances nouvellement installées dans l’UE.


Parc installé
Carte d'Europe des pays producteurs de courant PV
EurObserv'ER ©
Du côté du parc installé, le classement est le suivant : Allemagne (24.875 MWc) première puissance photovoltaïque européenne, Italie (12.763 MWc) deuxième et Espagne (4.214 MWc) troisième. La France échoue au pied du podium avec 2.831 MWc (DOM inclus). Les pouvoirs publics ont été pris de court face à cette croissance, aucun gouvernement ne prévoyant une baisse aussi rapide du prix des modules photovoltaïques. Baisse encore plus rapide que celle des tarifs d’achat d’électricité, ce qui n’a pas manqué d’entraîner une nouvelle course à l’installation, certains investisseurs cherchant à exploiter le différentiel entre tarif d’achat et coût réel du kWh solaire. Des pays comme l’Italie ou l’Allemagne ont donc le sentiment d’avoir financé au prix fort le développement de la filière et entendent serrer la vis.

Sous le soleil de France
En France, la croissance a été bonne, avec l’installation de 79.291 centrales (soit 1.634 MWc) durant toute l’année 2011. Un chiffre qui traduit le nombre de projets qui demeuraient en file d’attente avant le moratoire. Mais les puissances en attente de raccordement ont diminué en fin d’année. Aucune forte progression ne sera donc à attendre en 2012 : le secteur est soumis depuis le 4 mars 2011 à de nouvelles conditions d’achat de l’électricité dans lesquelles le gestionnaire du réseau gère la file d’attente et doit installer 500 MWc par an. Quant aux tarifs d’achat, ils affichent un rythme de dégressivité important, et sont définis tous les trimestres, en fonction du nombre de demandes de raccordement déposées. Les installations de plus de 100 kWc ne sont pas concernées par ces tarifs mais directement sélectionnées via des appels d’offres. Du côté des professionnels du secteur, on regrette la complexité du cahier des charges qui limite le nombre de prétendants. Les résultats du premier appel d’offres pour les centrales de 100 à 250 kWc ont été publiés au mois de mars, tandis que le second, pour les centrales supérieures à 250 kWc a été lancé en septembre 2011. Il porte sur 450 MW au total pour des installations à créer d’ici à 2014.


Le rayonnement solaire contribue désormais à 1,4 % de la production d’électricité de l’UE, avec 44,8 TWh (+98 %). Compte tenu de la puissance installée en fin d’année, la production d’électricité photovoltaïque devrait largement dépasser les 60 TWh en 2012, permettant à cette énergie de tutoyer le seuil des 2 %. Dans les pays les plus en pointe, cette part est supérieure à ce taux : 3,6 % en Italie, 3,1 % en Allemagne et 2,6 % en Espagne.


 

Les pays producteurs d'électricité PV 

 



Classement de la puissance photovoltaïque installée dans les pays de l'Union européenne en 2011 (en MWc) :


Allemagne 24.875
Italie 12.763
Espagne 4.214
FRANCE 2.831
République tchèque 1.959
Belgique 1.812
Royaume-Uni 1.014
Grèce 631
Slovaquie 488
Autriche 174
Portugal 144
Bulgarie 133
Pays-Bas 118
Slovénie 90
Luxembourg 31
Suède 19
Danemark 17
Malte 11,5
Finlande 11
Chypre 10
Hongrie 4
Roumanie 3
Pologne 2
Lettonie 1,5
Irlande 0,7
Estonie 0,2
Lituanie 0,1

Visitez également notre site internet pour plus d'informations sur les possibilités d'intégration de la technologie solaire :

Tuesday, June 5, 2012

Delhi Metro to tap solar power

Article published on http://www.thehindu.com/ Monday 4th June
Delhi's new age transport system is going green, with the Delhi Metro Rail Corporation planning to tap solar power in some of its facilities. The initiative announced to coincide with the World Environment Day, will help generate renewable energy and reduce DMRC's dependence on non-renewable sources of power.
Initially, solar panels are to be installed at the Karkarduma and Noida Sector 21 stations and the Yamuna Bank depot to capture solar energy which will be converted to electricity using appropriate technology. In addition, the Delhi Metro plans to harness solar energy at elevated metro stations, in depots and in open areas of the stations. Based on the success of the initiative, DMRC will further implement it for structures coming up under its Phase-III constructions.
DMRC's Managing Director Mangu Singh also announced a special drive which will see metro officials being trained in environmental awareness and environmental protection procedures in day-to-day metro operations. To foster sustainable development, he directed the Chief Project Managers in-charge of Phase-III constructions to ensure that all new contractors and sub-contractors who will be involved in construction activities be fully sensitised on environmental issues so that the work may be carried out in an environmentally responsible manner.
Find about our rooftop and other solutions :  

Record d’efficacité battu par une nouvelle cellule photovoltaïque

Record d'efficacité battu par une nouvelle cellule photovoltaïque
La cellule photovoltaïque atteindrait les 43, 5 % d'efficacité
A l’image de l’informatique, l’énergie astrale ne cesse d’évoluer. Le rendement annoncé par une nouvelle cellule photovoltaïque solaire en est la dernière preuve.


Ce nouveau record d’efficacité est détenu par Sharp, qui a mis au point une nouvelle cellule photovoltaïque dont le rendement a été estimé à 43,5 %, soit près de sept points de plus que le précédent, lequel était déjà la propriété du groupe japonais.  Un pas de plus vers le cap de 50 %, décisif à en croire les professionnels du milieu de l’énergie solaire et qui devrait révolutionner l’industrie.
Techniquement, la cellule solaire est composée de plusieurs couches constituées de deux éléments ou plus comme l’indium et le gallium. Le tout est couplé avec un concentrateur à triple jonction qui utilise un système de lentilles pour concentrer la lumière sur les cellules et ainsi produire plus d’électricité.


La cellule fait faire un grand pas en avant à l'énergie solaire, qui ne devrait pas tarder à franchir la barre des 50 % d'efficacité tant attendue par les chercheurs 

Le début des panneaux solaires à hauts rendements


Les panneaux solaires actuellement sur le marché ont une efficacité moyenne comprise entre 15 et 20 %. L’arrivée de cette nouvelle cellule grosso modo deux fois plus performante pourrait de fait permettre de doubler le rendement des parcs solaires, qui auraient alors beaucoup moins à envier aux centrales nucléaires. D’où, au bout du compte, une transition plus acceptable vers les énergies renouvelables.
La cellule a déjà été installée sur certains satellites mais les chercheurs travaillent sur une version pour le plancher des vaches. Encore un petit effort, on y est presque !


Découvrez nos solutions pour valoriser ces avancées technologiques sur :

http://ciel-et-terre.net/centrale-solaire-flottante/
http://ciel-et-terre.net/centrale-solaire-au-sol/
http://ciel-et-terre.net/centrale-solaire-en-toiture/

Monday, June 4, 2012

How Short-Term Shipment Delays Could Impact US Solar Market


Thursday, May 31, 2012

The Indian market offers large scale PV projects; rapid ramp up of solar power has put India on the global solar stage

Article published Wednesday 30th of May at www.solarserver.com
The feed-in-tariff (FiT) market in India is governed by various national and state policies. Solar installations prompted by project allocations under the National Solar Mission (NSM) and the Gujarat Solar Policy have driven India's installed solar PV capacity from 22MW in January 2011 to 974.56MW in May 2012. This rapid ramp up of solar power has put India on the global solar stage.
In Solar Server' May 2012 Solar Report guest author Mohit Anand, Senior Consultant at BRIDGE TO INDIA, closely examines market developments and opportunities.
 285 MW recently allocated in Karnataka, Orissa, and Madhya Pradesh
The NSM allocates projects under a competitive, reverse bidding mechanism to arrive at the lowest possible tariffs for its projects. All state policies, except Gujarat, follow a reverse bidding mechanism similar to the NSM. Gujarat allocates projects for a fixed FiT based on a technical and financial assessment of the project developers by a government committee. Projects have recently been allocated by the Indian states of Karnataka (60MW solar PV allocated), Orissa (25MW solar PV allocated) and Madhya Pradesh (200MW solar PV allocated).
PV plant in the state of Gujarat. Gujarat represents roughly 2/3 of the nation's installed PV and CSP capacity. 
On April 23rd, 2012 officials inaugurated a 1 MW canal-based solar photovoltaic (PV) plant
400MW is upcoming in Rajasthan
Another state that is in the process of allocating projects is the western Indian state of Rajasthan. Rajasthan is also poised to be a leader in installed capacity in the future as it has been the preferred location for projects under the NSM. Out of the 485MW of solar PV capacity with signed Power Purchase Agreements (PPAs) under phase one of the NSM, 400MW is upcoming in Rajasthan.

Market factors support larger projects 
Under the reverse bidding mechanism, projects are allocated to developers offering the maximum discount to a benchmark tariff set by the government regulatory authority. The allocation process in India is highly competitive and the capacity being sought by project developers is much higher than the capacity that is allocated. As an example, for an allocation of 350MW under batch two of phase one of the NSM, bids totaling 1,905MW were received. Due to the excessive competition, reverse bidding brings down the tariff significantly. The tariffs in India have been pushed to as low as INR7/kWh (EUR 0.10/kWh) for allocations in the state of Odisha (formerly known as Orissa).  Lower tariffs cut the margins for the developers and may make the projects financially unviable. This becomes more severe if the size of the projects is small. The only choice developers have is to develop larger projects so that they can bring down the effective cost per megawatt installed.
The average size of Indian PV projects nearly tripled since 2010
The average size of Indian PV projects nearly tripled since 2010
Inexperienced developers underestimating risks and challenges
Many inexperienced developers with no long term interest in solar power generation have entered the market opportunistically. Such developers are looking to take advantage of the accelerated depreciation and income tax benefits being offered by the government for solar projects. Most of these developers lack the experience of developing solar projects and, as a result, underestimate the associated risks and challenges. They prefer small projects as it allows them to limit their risks while being aggressive with their bids. As a result, they compete to get small capacities at tariffs that are financially unviable.
Many of these developers have not been able to achieve financial closure and have paid hefty penalties due to project delays. This has led the policy makers to increase the project sizes offered (Ref: Figure 1). For example, for batch two of phase one of the NSM, the capacity per project was increased to 20MW from the previous 5MW in batch one, and each developer could obtain a maximum of 50MW of solar PV capacity as opposed to only 5MW possible in the first batch. Further, the state of Odisha has allocated five projects of 5MW each with the lowest bidder having an option to obtain the entire 25MW, while the state of Madhya Pradesh has placed no limit on the size of projects that it has allocated.
 Bids for a particular tariff are based on speculations on component prices
In terms of execution, the time period between offering the tariff discount and buying the components for the plant is as large as six to ten months. As a result, a large part of the decision to bid for a particular tariff is based on speculations on component prices. The speculation needs to take into account the expected future module prices. This creates significant uncertainty for the developer. Typically, a developer with a large project is able to assume a benchmark cost for the modules and other components for the project calculations at the time of bidding. Then, because of having a large capacity in hand, the developer is able to leverage the project size to successfully procure components at the initially assumed benchmark costs from the suppliers. Smaller projects would be unable to mitigate the speculation risk in a similar manner.
Partial view of the Gujarat Solar Park scheduled on completion with 600 MW. 
Dr. Farooq Abdullah, Union Minister for New & Renewable Energy: The National Solar Mission contributes to India's long term energy security as well as its ecological security
Indian banks are reaching their cap on lending
Project financing is a key challenge for the project development community in India. On the cost side, interest rates in India are as high as 13-14% and reduce the margins significantly in a competitive environment. Moreover, Indian banks have been hesitant in lending to solar project developers. The primary reason is that solar lending in India is a part of the power sector, and the banks are reaching their cap on lending to it. As a result, many projects have been delayed and even cancelled as they have been unable to secure financial closure. This has prompted project developers to try and secure international financing for their projects. The effective interest rate for international financing with currency hedging is 200-300 basis points lower than Indian interest rates. International funding sources that have been lending to Indian solar project developers include the US Export Import Bank (EXIM), KfW Bankengruppe (Germany), Asian Development Bank (ADB) and the Overseas Private Investment Corporation (OPIC) among others. However, most international financiers are only willing to fund projects larger projects that are a minimum of 10MW. This is because smaller projects do not justify the associated transaction costs for such banks.
 Larger projects are here to stay
In the first leg of project allocations in India (NSM batch one of phase one and the Gujarat Solar Policy) inexperienced and non-strategic developers received around 56% of the project allocation share. Their share in recent allocations (NSM batch two of phase one and state allocations in Madhya Pradesh, Karnataka and Odisha) has gone down to 24%. These developers will not have a significant share of reverse bidding based FiT projects in the long run and the market will be dominated by larger, more experienced developers.
Most large project development opportunities in mature solar markets are drying out. Even most new markets like Japan, South America and the Balkans region are focusing on distributed generation.  India is one of the very few countries suited for larger projects. This makes India an ideal investment opportunity for investors and project developers looking for projects with scale.