Sheeplands farm  is the first site in the UK to install Hydrelio © floating solar PV
This system 
allows the farm to utilise their new 60 million litre irrigation 
reservoir by generating renewable energy on-site to power the 
reservoir’s pump. The installation of solar on water enables Sheeplands 
Farm to increase their energy independence without using up valuable 
land space.
.
This 200KWp 
installation is comprised of 800 market-leading Trina panels. The panels
 are assembled on land and then carefully lowered into the water. The 
installation also benefits from the government’s Feed-in-Tariff.